Snowy Monaro Section 7.12 Local Infrastructure Contributions Plan 2022
This Plan commenced on 1 July 2022 and applies to the entire local government area, except the area to which the Michelago Plan applies. Contributions are levied as a percentage of the cost of carrying out the development. This Plan applies to most types of development, except for those which do not generate demand for additional local infrastructure. Section 7.12 levies are charged in accordance with the following table:
Cost of Development
|
Contributions levy rate %
|
All development valued up to and including $100,000
|
0%
|
All development valued between $100,000 to $200,000
|
0.5%
|
All development valued in excess of $200,000
|
1%
|
Snowy Monaro Section 7.12 Local Infrastructure Contributions Plan 2022(PDF, 3MB)
Michelago Local Infrastructure Plan 2021 (Hybrid Section 7.11 & 7.12)
This Plan applies to the Michelago Village and surrounds and the R5 Large Lot Residential area. This Plan is a hybrid plan and the contribution will depend on the type of development. All non-residential development is subject to a Section 7.12 levy in accordance with the following table:
Cost of Development
|
Contributions levy rate %
|
All development valued up to and including $100,000
|
0%
|
All development valued between $100,000 to $200,000
|
0.5%
|
All development valued in excess of $200,000
|
1%
|
Section 7.11 Contributions are payable in relation to the majority of residential development, including subdivision in accordance with the following table.
Facility Type
|
Contribution indexed for September 24 quarter
|
Roads and Footpath Infrastructure
|
$12,244.68
|
Flood Mitigation and Stormwater Management
|
$2,167.55
|
Open Space and Recreation Facilities
|
$6,623.86
|
Waste Facilities
|
$1,135.52
|
Plan Preparation and Administration
|
$151.40
|
Michelago Local Infrastructure Plan 2021 (Hybrid Section 7.11 & 7.12) (PDF, 2MB)